Project Experience
Highways, infrastructure, warehousing and rail project delivery.
Selected project experience from Stanley’s civil engineering career, with emphasis on setting out, QA, drainage, earthworks, structures and site coordination.
At a Glance
Built around practical site engineering and delivery support.
Highways
A47, M1, M5, roundabouts, kerbs, surfacing and emergency areas.
Earthworks
Formation, capping, volume calculations, machine control and as-builts.
Drainage
Drainage runs, chambers, catchpits, headwalls and attenuation systems.
Structures
Bridge works, foundations, retaining walls, pile caps and FRC columns.
Recent and Major Projects

Glencar — Chatteris Warehouse Unit
Industrial warehouse development including warehouse, offices, service yards, parking, landscaping, S278 works and CAT B fitout.
- Setting out CMC piles, S278 road works, drainage, earthworks and concrete yard areas.
- Attenuation tank, siphonic drainage, fire track and footpath controls.
- As-built surveys, AutoCAD drawings, QA records and check sheets.

M O’Brien — A47 North Tuddenham Scheme
Strategic road network scheme including 9km dual carriageway, new junctions, bridges, drainage, utilities, laybys and active travel routes.
- Drainage setting out, chamber locations, line and level controls.
- Earthworks surveys, machine control, volume calculations and inspections.
- Kerb setting out, road surfacing preparation and QA documentation.


Forkers Ltd — National Emergency Area Retrofit, M1 J16-19
Emergency Refuge Area construction including drainage, catchpits, headwalls, earthworks profiles, surfacing and communications ducts.


Eurovia — Spalding Western Relief Road
New road link, roundabout, overbridge, culvert bridge, retaining walls, footways and cycleway routes.

Buckingham Group / HS2 — Calvert North Section
Overbridge construction including blinding, foundations, FRC pile caps, FRC columns, earthworks and waterproofing.

Winvic — Northampton Gateway
Rail terminals, management offices, warehouses, lorry park, roundabouts and road links connecting the A508, A45 and M1.
Costain / Galliford Try JV — M1 J13-J16 Smart Motorway
Smart motorway / digital roads upgrade, converting hard shoulder to permanent running lane and installing digital road technology.
Earlier Roles — Volker Fitzpatrick & Vinci Construction
Additional experience across highways, depot, bridge repair, surfacing, smart motorway and access works.